荷载控制 meaning in Chinese
load control
Examples
- The checking methods of prestressed concrete penstock during construction stage are suggested . the formula is proposed to calculate the maximum distance of two consecutive strands to be result in uniformly distribution of concrete prestressed along the penstock
提出了相邻环预应力筋束的最大间距计算公式,确定了以混凝土抗裂为目标进行预应力筋束分步张拉施工与荷载控制的方法。 - Members section of the steel truss are designed mainly according to vertical load , which earthquake load can not change . however , changes of members stress should be regarded , such as the steel truss members connecting shearwall
钢桁架转换结构设计主要受竖向荷载控制,地震荷载不改变其主控荷载,但对地震荷载作用下钢桁架构件受力的变化应予以重视,尤其是与竖向构件连接的钢桁架两端构件。 - Structural internal forces and deformation caused by seismic load are bigger than that caused by automotive load . seismic load controls the designing of large span and small " width - to - span " ratio of large span cfst arch bridge . the seismic resistance is bigger than that with considering combination of various directions , so seismic load combination of various directions should been taken into account during design of large span cfst arch bridge
地震荷载所引起的内力和变形均大于车辆荷载引起的内力变形,对大跨、宽跨比小的钢管混凝土拱桥来说,应以地震荷载控制内力和变形设计,考虑多方向地震荷载的组合后,所得的地震力更大,说明在计算地震力时,应该考虑多方向地震荷载的组合。 - The methods considering the elastoplasticity are the elastic - plastic hinge method and the pseudo load method . based on the need of non - linear analysis , researchers brought forward nonlinear calculation methods to control the iterative constringency , such as the load controlling method , the displacement controlling method , the arc length controlling method and the pseudo load method
考虑弹塑性的分析方法有:弹性-塑性铰法和虚拟荷载法根据非线性研究分析的需要,研究人员先后提出了:荷载控制法、位移控制法、弧长控制法和做功控制法等控制迭代收敛的非线性计算方法。