×

直接材料和 meaning in Chinese

maintain material tracking report

Examples

  1. Prime costs represent the costs of direct material and of direct labor .
    主要成本中包含了直接材料和直接人工费用。
  2. Standard cost is a kind of method to calculate cost , by which indirect and cost are calculated according to the expected number
    摘要标准成本是一种成本计算方法,它不仅间接费用是预计的,而且直接材料和直接人工等也是按预计的数字来计算的。

Related Words

  1. 直接材料存货
  2. 直接材料耗用差异
  3. 直接材料价格差异
  4. 直接材料结构差异
PC Version

Copyright © 2018 WordTech Co.