电联车 meaning in Chinese
electric multiple unit
Examples
- The mrt is on time more often than not
捷运电联车通常很准时 - At that time , owing to the limited construction funds and a lack of related regulations on environmental noise and vibration , dorts referred to the gc report of environmental assessment and thus adopted two remedial measures . one was to draw up contracts stipulating the specification of the environmental control systems and train types for noise reduction . the other was the utilization of continuous seamless welded rails to attenuate vibration
由于当时客观上国内尚未有噪音及振动相关法规,本局又受限于捷运工程经费限制,于参考总顾问报告后,在噪音控制方面:针对环控系统及电联车订定相关合约规范;在减少振动方面:轨道系统采用无缝长焊钢轨。 - Application of the mf method normally involves construction of an intermediate column at every 4 meters . on a crossover section , which serves as a passage for train change directions , intermediate columns placed at 4 - meter intervals would block the route of a turning train . therefore , a solution must be found to the problem of location of intermediate columns on crossover sections
(四)转辙段( crossover )处以多圆形潜盾工法施作之可能性,由于转辙段系为提供电联车换轨功能之处,两轨道间不能有任何障碍物,而多圆形隧道环片间每隔四米即需中间柱,于设计上有何解决之道。