×

灌浆帷幕 meaning in Chinese

grout curtain
grouted cut off wall
grouted cutoff wall
grouting screen

Examples

  1. Complicated hydrologic and geographic conditions , and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly . three desilting tunnels are designed to meet the requirements of flood control , sediment discharge and runoff regulation . according to the performance requirements of desilting tunnels , the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining . on the basis of investigation and research , experiements and analysis , the unbonded prestressing system is used . it is the largest unbonded prestressed tunnel lining project in the world , and the first one in china
    简介黄河小浪底水利枢纽复杂的水文、地质条件以及庞大的工程规模.该枢纽设计有3条排沙洞,担负着泄洪、排沙、调节径流和保证进水口不被泥沙淤堵的任务.根据排沙洞的水库运用要求,灌浆帷幕下游排沙洞洞身段设计为混凝土后张预应力隧洞.通过大量的调研、试验、分析论证,在施工前确定该预应力方案选用无粘结预应力系统,成为目前世界上规模最大的无粘结预应力隧洞衬砌工程,在国内尚属首例
  2. According to the geological conditions of baise project , erosive bands and joint fissures , f6 fault and grout curtain are fully simulated to establish 3d numerical model of the dam and its foundation . 3d non - linear fem is used to analyze the stress and strain and to appraise the operation state of both the dam and it ' s foundation under different operation conditions . by overloading the upstream water level and reducing rock strength parameter , the dam foundation ' s degradation process is simulated and the damage pattern and paths are determined , and finally the safety factor is determined
    2 、根据百色的地形地质条件,充分模拟了蚀变带、节理裂隙、 f6断层、灌浆帷幕等,较为真实地建立了坝体与地基相互作用的整体三维数值模型;采用有限元法对坝体及坝基在不同工况下的应力应变状态开展分析,评价各工况下坝基的运行状态;而后采用超载法和综合法对大坝稳定性进行分析,模拟坝基的渐进性破坏过程,从而得到坝基在超载和强度下降过程中的破坏模式和破坏发展路径,最终确定坝基超载安全系数和综合安全系数。

Related Words

  1. 缝编半透明帷幕
  2. 灌浆阀
  3. 灌浆设备
  4. 灌浆孔
  5. 灌浆套筒
  6. 灌浆管
  7. 灌浆钻孔
  8. 灌浆系统
  9. 密封灌浆
  10. 灌浆作业
  11. 灌浆作业
  12. 灌浆圬工
  13. 灌江
  14. 灌浇
PC Version

Copyright © 2018 WordTech Co.