深圳河治理工程 meaning in Chinese
shenzhen river regulation project
Examples
- With the stage i and stage ii works completed , the river section downstream of lo wu has been improved to the required flood protection standard of " one in 50 years "
深圳河治理工程计划的第i及ii期已完成,罗湖下游一段的河道已获得改善,达到能抵御五十年一遇暴雨的防洪标准。 - By the turn of the century . the design of various flood control schemes for the river indus is progressing with completion dates to tie in with the shenzhen river regulation project so as to relieve the risk of flooding by 2002
多项梧桐河防洪计划的设计工作正在进行,预计完工日期可配合深圳河治理工程,目的是在二零零二年或之前,可减低发生水浸的危险。 - Protection against flooding is being improved in the area . the construction works for some of the flood control schemes for the river indus are progressing with completion dates to tie in with the shenzhen river regulation project so as to relieve the risk of flooding by 2002
梧桐河防洪计划多项工程正进行得如火如荼,竣工日期均已订出,务使工程与深圳河治理工程配合,以期在二零零二年或之前减低水浸风险。