水泥粉煤灰碎石桩 meaning in Chinese
cement fly-ash gravel pile(cfg)
cement-flyash-gravel pile(cfg)
cfg
Examples
- Cement - flyash - gravel pile
水泥粉煤灰碎石桩 - Results of calculation show that dissipation of excess pore water pressure due to squeezing effect of concrete - cored sand - gravel piles is faster than that of the ordinary cfg piles
算例表明,成桩后的混凝土芯砂石桩,其挤土效应产生的超孔隙水压力的消散,远快于常用的水泥粉煤灰碎石桩( cfg桩) 。 - There are many methods of foundation consolidation for civil engineering , such as soil exchange method , prepress method , dynamic consolidation method , vibrancy rushing method , soil and podsol dense pile method , sand pile , cement - coal - powder and gravel pile method , deep mixing method , high - pressure eject masonry , etc . the dynamic consolidation and deep mixing method ( dmm ) are very common in project construction
目前国内外地基处理的方法很多,主要的地基处理方法包括:换填法、预压法、强夯法、振冲法、土和灰土挤密桩法、砂桩法、水泥粉煤灰碎石桩法、深层搅拌法以及高压喷射注浆法等。其中强夯法和深层搅拌法是工程建设中较常用的加固方法。