×

模糊动态规划 meaning in Chinese

fuzzy dynamic programming

Examples

  1. The fuzzy dynamic programming approach is proposed to find a proper dispatching schedule for shunt capacitors in the distribution system
    最后,采用模糊动态规划法求解配电网电容器的优化投切问题。
  2. From the viewpoint of method , the first step is to determine the available investment options or opportunity set of the locations of crude oil tankers zone involving some six representative factors such as the unit engineering expense , unit operating cost , constructing period , the location land features , unit constructing engineering amount , unit land opportunity cost . these factors stem from the economic , societal and environmental regulations and rules . the second step is to specify how to choose among these available options
    从方法上来看,首先确定以单位工程造价、单位运行成本、建设期、地形特征、单位土建工程量、单位土地机会成本等六个综合经济、社会及环境指标为代表的原油罐区方案决策目标集,其次制定桃园、西山、填海三个决策待选方案,然后建立基于优先关系的相对优属度矩阵及各影响因素的权重集,从而进行模糊动态规划评价,最后优选出最佳的桃园方案。

Related Words

  1. 泪眼模糊
  2. 模糊百分比
  3. 更模糊
  4. 模糊连续
  5. 模糊一致
  6. 模糊联盟
  7. 模糊分类法
  8. 模糊资讯
  9. 模糊对象
  10. 模糊斑
  11. 模糊电力系统稳定器
  12. 模糊迭代交感
  13. 模糊动态系统
  14. 模糊度
PC Version

Copyright © 2018 WordTech Co.