- Ultimate load designs according to the yield-line or strip methods do not guarantee safety against cracking or excessive deformation .
接屈服线法或条带法的极限荷载设计不能完全保证抗裂或防止过度变形。 - According the data of actual project and integrating the approximately earth pressure of loess area , this thesis compile a series of lanzhou loess area support program with c + + and the method of criterion . analyzed and calculated many actual projects with the program , monitoring the procedure and collecting the data in some works to perfect the program and work hard to make it to sale . according cantilever supporting pile , one - anchored supporting pile and soil nails support of loess area , this thesis select the best support method and structure form
本文从实际工程出发,根据规范中的极限荷载设计法结合黄土地区深基坑的近似实际土压力分布情况,用c + +语言编制一套适合兰州地区黄土深基坑支护的计算机辅助设计程序,用本程序分析计算了多个实际工程,并在这些实际工程的基坑开挖过程中实行信息监测,收集有关数据以回归检验研究成果以及完善这套程序,使其能真正的应用到实际工程,并力争使其商品化。