最终验收 meaning in Chinese
acceptance final
final acceptance
Examples
- Probe into the engineering mechanical completion and final acceptance optimization
工程机械竣工和最终验收优化的探讨 - System installation includes start - up and performance test and will be carried out by the service engineer of c & s company
中瑞公司负责测量机的安装、调试以及测量机安装现场的最终验收。 - Responsibilities : the mechanical engineer is in charge of the project from the design to the commissioning and final acceptance of the equipments
岗位职责:机械技术工程师负责从设备设计、现场调试到最终验收的一系列工作。 - Packaging - requirements for packaging recoverable through composting and biodegradation - test scheme and evaluation criteria for the final acceptance of packaging
包装.通过合成及生物降解规定包装可回收性的求.试验计划和包装最终验收评定标准 - The warranty period shall be 12 months counting from the date on which the buyer , the end - user and the seller sign the certificate of final acceptance of the contract goods
保证期自买方,最终用户和卖方签署合同货物最终验收证书之日起十二个月。