施工详图 meaning in Chinese
ausfuehrungszeichnung
construction details
constructional details
detail of construction; construction detail; working drawing
detail working drawing
shop detail drawing
working details
Examples
- The technological innovation and optimum design were implemented by the design organization during the working drawing period , as a result , the new technology of separated floor for draft tube bend is applied , and the optimized arrangement plan of structure is more compact , the structure form is more rational , rate of progress is accelerated , about 1 . 37 hundred million yuan is saved , which is of significant general benefits
施工详图阶段,设计单位根据创建节约型社会的宗旨,积极开展一系列技术创新和优化设计工作,并首创了厂房尾水管肘管段分离式底板新技术,优化设计后枢纽布置更加紧凑,建筑物结构形式更为合理,加快了施工进度,节约工程投资约1 . 37亿元,综合效益显著。