施工的方式 meaning in Chinese
manner of execution
Examples
- In the light of theory and application , the author raised that sacrifice anode protection could be used on old fuel gas pipes in shen zhen city , and also raised the choice of sacrifice anode , detailed process calculation , the design of ground bed , execution method and detection management
本论文在理论和实际应用的基础上提出了深圳旧燃气管道宜采用牺牲阳极保护,并提出了牺牲阳极的选择、具体的工艺计算、地床的设计、施工的方式和检测管理。 - Based on the studies , it is proved that lime fly - ash mixture is provided with more time to compact during construction compared with other base materials in forming even higher structure strength but not in reducing strength within 1 ~ 3 days period of time . meanwhile , structure strength of the mixture which has been destroyed by some reasons can be recovered in a great extent if original structure is regained . on the other hand , during the high temperature summer season or under other conditions promoting the mixture to form strength , continuous construction process between lime fly - ash base course and bituminous pavement can be carried out to complete the building process in short time
确认二灰基层材料与其它类型的基层材料相比,在施工时具有较长的施工碾压成型时间,在一定时间里延迟成型的二灰基层强度不仅不降低,反而还有一定程度的提高;与此同时早期受到破坏的二灰材料在恢复整体性的条件下,结构强度能够在很大程度上得到再恢复;另一方面,在夏季高温季节以及在强化基层强度形成的前提下,二灰类基层和沥青面层可以采用连续施工的方式在较短的时间里完成路面铺筑工作。