×

断面法 meaning in Chinese

crosssectional method
method of cross-section survey
method of sections
profile method
range method
ritter's method

Examples

  1. Analysis of acceptance measuring accuracy using fixed - section method
    固定断面法验收测量精度分析
  2. The application of method of alter average section in earthwork volume calculation
    用变更平均断面法计算铁路土石方工程量
  3. To solve the inaccuracy problem caused by the two existing methods ( average end - area method and prismoidal method ) used for the calculation of roadway earthwork volume , this paper puts forward a new concept of the 3 - dimensional algorithm that takes all the roadway geometric design procedures as a kind of geometrical operation between the ground model ( original terrain model ) and the roadway model ( designed model ) under certain constraints , and then presents a complete 3 - dimensional algorithm of roadway earthwork volume as well as its executable computer program . the algorithm benefits from the re - triangulation technique of constrained delaunay triangulation ( cdt ) , which can yield a true volume value theoretically . through a number of practical tests covering varied intervals between adjacent cross sections , it is proven to possess a higher accuracy compared with that of traditional methods . all the work involved in this paper indicates that the 3 - dimensional calculation of roadway earthwork volume is feasible , more accurate and should have further application in practice
    针对目前广泛使用的道路土方量计算方法平均断面法和棱柱体法计算不准确的缺点,提出了三维土方量计算算法的概念.该算法以带约束的狄罗尼三角化( cdt )为技术核心,认为所有道路几何设计过程都是地面模型和道路(设计)模型进行几何运算的结果.基于此,本文设计出相应的算法步骤,同时完成了相应的软件开发,使得该三维算法能和传统的方法进行对比.此外,结合工程实例,采用了不同的道路横断面间距对三维计算方法和传统方法的误差进行比较、分析.结果证明三维算法具有更好的精度,该算法可用于道路、场地平整等工程土方量计算
  4. The paper introduces the progress and the statue quo of tunnel portal construction , discusses the condition to employ full face method , bench cut method , single side heading method and double sides heading method of portal construction , points out advantages and disadvantages of these methods . the order to adopt these methods of single track , double track and tri - track tunnel in shallow - depth , uneven pressure and incompact ground is also advised after compare
    讨论了全断面法、台阶法、单侧壁导坑法和双侧壁导坑法在隧道洞口段施工中的使用条件和优缺点,对这四种施工方法从各个方面进行了比选,提出了单线、双线和三线隧道的洞口段处于浅埋、偏压、松散的地层中时各种施工方法选择的先后顺序。

Related Words

  1. 菱形断面
  2. 瓷断面
  3. 椭圆形断面
  4. 断面系数
  5. 沟断面
  6. 线性断面
  7. 隧道断面
  8. 地学断面
  9. 断面面积
  10. 挖土断面
  11. 断面二次半径
  12. 断面二次矩
  13. 断面反射
  14. 断面分布
PC Version

Copyright © 2018 WordTech Co.