×

排水工作 meaning in Chinese

drainage works

Examples

  1. It is important for drainage work since checks can be made on its effectiveness before planting .
    排水工作很重要,因为在栽植前就可对其效果加以控制。
  2. Observe the site condition especially the south hidden creek area in any moment , arrange the dewatering and drainage according to the site actual condition and weather condition , ensure the successful construction
    随时观察现场情况,重点是场地南侧的暗浜区域,根据现场实际情况和天气条件安排降水和排水工作,保证压桩安全,顺利地施工
  3. The lining of a tunnel in the area with high groundwater table does not bear high external water pressure in - normal , the surrounding rock reinforced by intrusion concrete does it . in the case , the groundwater through reinforced rock accumulated in the space between lining and rock must be drained in time
    一般铁路隧道通过高水位富水区时,不用衬砌直接承受较高的外水压力,要实现这个设计目标必须做好衬背的排水工作,使通过加固圈渗透过来的水量及时排走,及时削减累积的水量。

Related Words

  1. 排水井
  2. 排水塞
  3. 排水暗沟
  4. 排水器
  5. 带状排水
  6. 排水入口
  7. 陶管排水
  8. 桥梁排水
  9. 排水垄沟
  10. 排水工具
  11. 排水工程师
  12. 排水工具
  13. 排水沟
  14. 排水沟;截水沟
PC Version

Copyright © 2018 WordTech Co.