挖泥作业 meaning in Chinese
dredging operation
Examples
- 3 a closed grab shall be used for all dredging operations
所有挖泥作业须使用闭合抓斗。 - Construction and demolition operations - dredging , safety requirements for
建筑施工和拆除工作.挖泥作业的安全要求 - 4 the dredging operation shall be at rate of no more than 40 m3 per hour within the designated site boundary
在指定工地界线内进行的挖泥作业,须以不超出每小时40立方米的速度进行。 - Closed grabs that are capable of taking contained buckets of sediments without leakage shall be used for all dredging operations
所有挖泥作业须使用闭合抓斗,可以抓紧满载沉积物的容器而不会渗漏。 - Dredging operations will be carried out in the ponds to ensure that contaminated sediments are not inadvertently allowed into the new drainage channel
池塘会进行挖泥作业,确保受污染的沉积物不会因疏忽而流入新的排水道。