×

挖泥作业 meaning in Chinese

dredging operation

Examples

  1. 3 a closed grab shall be used for all dredging operations
    所有挖泥作业须使用闭合抓斗。
  2. Construction and demolition operations - dredging , safety requirements for
    建筑施工和拆除工作.挖泥作业的安全要求
  3. 4 the dredging operation shall be at rate of no more than 40 m3 per hour within the designated site boundary
    在指定工地界线内进行的挖泥作业,须以不超出每小时40立方米的速度进行。
  4. Closed grabs that are capable of taking contained buckets of sediments without leakage shall be used for all dredging operations
    所有挖泥作业须使用闭合抓斗,可以抓紧满载沉积物的容器而不会渗漏。
  5. Dredging operations will be carried out in the ponds to ensure that contaminated sediments are not inadvertently allowed into the new drainage channel
    池塘会进行挖泥作业,确保受污染的沉积物不会因疏忽而流入新的排水道。
More:   Next

Related Words

  1. 挖地道
  2. 回挖
  3. 挖个坑
  4. 风挖穴
  5. 金挖耳根
  6. 挖浆机
  7. 挖斗能力
  8. 挖沟勘探
  9. 挖坑道袭击
  10. 水道挖渠
  11. 挖泥装置操纵台
  12. 挖泥自动化
  13. 挖泥戽斗
  14. 挖牛
PC Version

Copyright © 2018 WordTech Co.