×

拆模时间 meaning in Chinese

striking times
time of stripping

Examples

  1. Research on form stripping age of underground works
    地下工程衬砌拆模时间研究
  2. ( 2 ) the stress caused by heat of hydration during construction is mainly distributed in the beams , and girders and stress in slab was smaller ; during service process , the stress caused by difference in temperature in different seasons is mainly distributed in bottom components ; the stress caused by difference of inside and outside temperature is mainly distributed in peripheral components of building ; the stress caused by difference in temperature due to sunlight is mainly distributed in the components exposed to the sun . ( 3 ) the control methods brought forward such as setting the reasonable stripping time reducing cast temperature of concrete setting after - treatment joint inflicting prestress arranging steel for construction requirement and so on are effective and their application may be extended
    在使用期,由季节温差作用引起的结构内力主要分布在底层构件上;由内外温差引起的内力主要分布在建筑物外围构件上;由日照温差引起内力主要分布在向阳面的构件上; ( 3 )在施工阶段,可采取使用导热性能较好的模板、合理设计拆模时间、降低浇筑温度等措施来减小水化热引起的结构内力;采用设置后浇带的措施来减小结构在整体降温情况下产生的温度内力。

Related Words

  1. 开拆
  2. 拆验
  3. 拆夥情缘
  4. 拆机器
  5. 分组装拆
  6. 当地拆箱
  7. 拆接过程
  8. 拆模时间表
  9. 拆壁脚
  10. 可拆驳
  11. 拆模板
  12. 拆模板时间
  13. 拆模时间表
  14. 拆模作业
PC Version

Copyright © 2018 WordTech Co.