总填方 meaning in Chinese
general fill
Examples
- The overall fill amount of the airport is 1091 . 2347 noyriastere and the height of the fill is almost 60m , with pertains to the high fill projects of the airport , whose site to prography and lithology is very varied . the basement of the till area is a slope dip place of slow dip downhill roch . there the research on the stability of the side slope filled is very necessary , this is because not only the design construction operation and investment of project is under influence , but also the feasibility of the projecct is also restricted , which is the key of the successful construction of the airport
为开发资源,改善投资环境而兴建的荔波机场位于贵州省荔波县东北约12km ,机场总填方量1091 . 2347万m ~ 3 ,填方高度近60m ,属高填方机场,其场址地形及岩性复杂,填方区基底为缓倾角顺坡岩层的斜坡地区,因此填方边坡的稳定问题研究是十分必要的,因为不仅影响到工程设计、施工、运行和工程投资,甚至制约着工程的可行性,是机场安全顺利建设的关键。