×

底盒 meaning in Chinese

chassis

Examples

  1. 400ml navigation box - body
    400ml航空盒底盒
  2. 300ml navigation box - body
    300ml航空盒底盒
  3. Pay attention to the correct installation of ground wire ( line 5 ) when connecting lines with substation
    预埋安装塑料底盒时,一定要待水泥干燥后,才能预埋安装塑料底盒。
  4. The crown f1 take - off system meets the high standards and rule of the iaaf and caa . the crown take - off system consists of the foundation tray , take - off board , blanking lid and the plasticine insert . take - off board
    皇冠牌f1起跳板系列符合高标准和iaaf caa规则,皇冠牌起跳板是由底盒起跳板橡皮泥板和底盒填充板组成。
  5. Any incorrect operation to connect a ground wire ( line 5 ) of the substation in one bus will badly affect the whole system , i . e . : any substation in corresponding 1 - 20 call master station will be difficult or fail to select
    为确保防暴分机的正常安装,将随机配送的安装底盒支撑杆放进安装底盒内(如上图所示) ,能有效防止塑料底盒向内变形。

Related Words

  1. 底荷
  2. 底荷河道沉积
  3. 底痕
  4. 底横梁
PC Version

Copyright © 2018 WordTech Co.