工程更改 meaning in Chinese
engineering change (ec)
Examples
- Control engineering change with manufacturing department
监控制造过程的工程更改。 - Follow material ecn and reduce ecn obsolete cost
跟进材料工程更改通知,减少因工程更改而导致的报废。 - 3 evaluating parts cost change caused by ewo ( engineering working order ) .
" 3审核工程更改造成的零件成本变化。 - Ecs engineering change schedule
工程更改日程表 - Ecp - engineering change proposal
工程更改建议