工期计算 meaning in Chinese

duration calculation

Examples

  1. Lastly to the engineering problem such as time calculation , resource optimization and data management , optimum solution is designed , and the algorithm for generating prior sequence based on common path are originally presented
    同时分析了项目管理系统中的工期计算、资源优化、数据管理的问题,并给出基本的解决思路,同时创造性提出了基于共同顺序生成优先序列的优化算法。
  2. By comparing the results of the living example , it analyzes the inconsequence of the old algorithm about the key line of the fiizzy network and verifies the rationality of the new method based on the new definition advanced . it offers a new means to calculate project time limit about indefinite item planning - management
    通过实例计算结果比较,分析了以前模糊网络关键路线算法的不合理性,证实了本文提出的新的定义下模糊关键路线法的合理性,为非确定性项目计划管理提出了新的工期计算方法。

Related Words

  1. 工期
  2. 剩余工期
  3. 滞后工期
  4. 工期定额
  5. 原始工期
  6. 工期索赔
  7. 最佳工期
  8. 赶工工期
  9. 悲观工期
  10. 提前工期
  11. 工期定额
  12. 工期计划要求
  13. 工期索赔
  14. 工期压缩