工序时间 meaning in Chinese
working procedure time
Examples
- Using the logarithm graph , multi - varieties production batch problem is resolved . the production scheduling is realized with heuristic traverse algorithm . at last , the strategies , which include disassembling task , shorting interval of the working procedure , overlapping working procedure , deferring the back working procedure etc . , are brought forward to deal with the order ' s inserting , postponement , freezing and doing again on carrying out the production plan
3 )分析了企业职能信息系统的集成性和各部门间的协调性,研究车间生产计划的制订过程,以模糊多属性折衷式模型实现了工艺路线的决策,采用对数坐标图表法,解决了多品种生产批量问题,用基于启发式的遍历算法实现了生产工单的排产,最后提出了任务分解、缩短工序间隔,相邻工序时间叠加,延迟后续工序等控制策略处理计划执行过程中工单的插单、延期、挂停与返工等特殊问题。