- The dam for chahanwusu hydropower station is the first one among the concrete faced rock - fill dams under construction with the height of over 100 m and the toe slab being constructed on thick and deep cover in china
摘要察汗乌苏水电站水库大坝为目前在建的河床趾板建在深厚覆盖层上国内首座百米级的混凝土面板堆石坝。 - Based on the tests and comparisons on the crushing slip - form tests of cushion material side - slope and the crushing tests of cushion material moving sidewall of the dam , we determined to adopt cushion material moving sidewall crushing technology in chahanwusu concrete facing rockfill dam
摘要在对大坝垫层料边坡挤压滑模试验和垫层料移动边墙挤压试验方案研究比较后,决定在察汗乌苏面板堆石坝中采用垫层料移动边墙挤压技术。