×

坝基处理 meaning in Chinese

treatment of dam foundation

Examples

  1. Application of arch structure in arch dam foundation treatment
    拱型结构在拱坝坝基处理的应用
  2. Strengthening mechanism of netlon network gravel foundation and its application
    限动碎石垫层在坝基处理中的应用
  3. Application of vibration percussion in treatment of the foundation of flood control emergency project in liao river
    振冲法在辽干防洪应急工程坝基处理中的应用
  4. The foundation treatment for dalong water control project mainly consists of vibro - compaction and vertical anti - seepage
    摘要大隆水利枢纽工程坝基处理主要包括振冲加密和垂直防渗工程。
  5. A brief introduction is given to the treatment of the zeya dam foundation , principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir . as for the excavation of the sand - gravel zones , except the toe slab and its 1 / 9 bottom width down stream , the alluvial layers are excavated to the micro - weathered rocks , while the other sections remain unexcavated . regarding to the treatment of the fracture zones , concrete filling is used for the toe slabs and semi - permeable materials are used for other section . according to the construction characteristics , a filter is placed in the down stream embankment foot . to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted . as a result safety , economic benefit , convenience in construction and good performace are achieved
    简要论述泽雅水库面板堆石坝坝基处理和防渗的原则及设计要点.趾板基础和堆石体各区砂砾石基础开挖,除趾板与其下游1 / 9底宽范围以及坝脚挖除冲积层至弱风化(局部微风化)基岩外,其余部分均予以保留.断层破碎带处理,趾板部位采用混凝土塞,其它部位采用半透水料置换,并根据本工程特点在下游坝脚加设了反滤层.为提高坝基的整体性和防渗性能,对趾板进行了固结和帷幕灌浆.达到了安全、经济、便于施工的目的,运行情况良好,可为面板堆石坝的设计和研究提供参考与借鉴

Related Words

  1. 坝基
  2. 清除坝基
  3. 坝基勘察
  4. 坝基渗漏
  5. 坝基截水墙槽
  6. 坝基补缝填坑处理
  7. 坝基最底部以上高度
  8. 坝基
  9. 坝基补缝填坑处理
  10. 坝基截水墙槽
  11. 坝基勘察
PC Version

Copyright © 2018 WordTech Co.