地下穿越 meaning in Chinese
subterranean crossing
Examples
- According to the comparison , this paper draws a conclusion that it is feasible to construct a tunnel under the operating runway and provides some advices for the construction of serving driveway
通过研究得出在浦东机场已有跑道下实施地下穿越是可行的,并提出了建议实施方案,为浦东机场进一步规划细化和服务车道地下穿越提供技术支持。 - Its fully automated operation is handled by the operation control center in depot . during the operation , if any unusual condition occurs the computer will alarm and stop all the vehicles on line immediately , then , after staffs solve the malfunction the system will be back to operation and this leads mucha line to extremely high safety . furthermore the trains of this line are fitted with noise mitigation rubber tires for running on reinforced concrete surfaces and with this function the noise can be reduced efficiently
木栅线未来将延伸至内湖,自中山国中站往北经复兴北路转至松山机场后,地下穿越基隆河至大直地区北安路,再以高架方式往东沿内湖路文德路成功路康宁路后,进入南港经贸园区,总长约14 . 8公里,将设12个车站及一座维修机厂,预计可望于97年中通车,以提供大直内湖地区居民及松山机场旅客最佳的通勤旅运工具。 - As far as vibration is concerned , there is an urgent need to establish relevant laws and standards that not only conform to international standards but also satisfy local residents . these standards must be set according to the technical limitations that govern mrt construction in densely - populated areas : namely , line configuration , station location , headway , soil cover , proximity of residences , underground passage , road width , etc
又如振动问题,在狭隘都会区中建造捷运系统,受到线形、设站、车间距、道路覆土深度、紧邻民房、地下穿越、路辐等技术限制,故如何订定一套合于国际潮流之标准又能府合民意之 - For the needs of second - term project for pudong airport there is possibility to construct a tunnel of serving driveway under the operating runway , but it s obviously of great difficulty , and nowdays there are few such projects for reference , so it is urgent to carry out the research to make sure of the feasibility for the construction based on the analysis of geologic information , cross section of the line and restriction of construction , in this paper three construction schemes and the effects of each scheme were analysed : cut and cover method , pipe roof culvert box advancing method . shield driving method
摘要浦东国际机场二期工程建设存在着在运营跑道下实施地下穿越的可能性,在运营跑道下实施地下穿越难度很大,而目前国内外软土地区在跑道下实施地下穿越工程很少,因此论文通过研究分析了服务车道地下穿越跑道区域的可行性及方案。