×

土方量 meaning in Chinese

earth quantity
earth volume
volume of earthwork
yardage

Examples

  1. Application of erdas imagine in the earthwork calculation of subsided land reclamation for coal mining
    在采煤沉陷地复垦土方量计算中的应用
  2. According to the investigation of the dykes in xinxiang reach of the yellow river , the annual volume of soil erosion caused by storm runoff amounted to 0 . 07 million cubic kilometres
    根据我们对新乡地区内沿黄大堤的调查,每年暴雨径流侵蚀大堤的土方量约达7 104m3以上。
  3. Abstract : this paper analyzes theoretically the error in calculating t he volume of earthmoving work by simplified algorithm in practice and a correct simplified formula is recommended
    文摘:从理论上分析了实践中应用的几种土方量简化算法存在的错误之处,并提出了正确的速算公式。
  4. The minimum erathwork of slope cutting is regarded as target function , and the anticipated factor of safety of slope as a constraint condition , so this problem is equivalent to optimality one with constraint conditions . thus the optimal scheme of slope cutting can be obtained
    这里将最小的削坡土方量作为目标函数,将预期的边坡安全系数作为约束条件,把削坡问题等价于一个有约束的优化问题,可找出最优的削坡方案。
  5. The pivotal problems in the land unknotting work , such as the coordination with other land consolidation and rehabilitation project , the technical standard , the basic method and the account of earthwork quantity of land unknotting , are discussed in this paper
    本文对土地平整与其他土地整理工程的协调问题、土地平整应遵循的技术标准、土地平整的基本方法,特别是土地平整土方量的计算方法等土地平整工程的关键性问题,进行了初步分析。
More:   Next

Related Words

  1. 土方
  2. 废土方
  3. 土方机械
  4. 山坡土方
  5. 剩余土方
  6. 土方搬运
  7. 土方调配
  8. 土方分析
  9. 土方作业
  10. 土方截面
  11. 土方累积体积
  12. 土方累计体积
  13. 土方量测定
  14. 土方量累计仪
PC Version

Copyright © 2018 WordTech Co.