发电洞 meaning in Chinese
power tunnel
Examples
- According to the test and observation indicated that mostly fish goes upstream and far away the sluiceway when fish migration , so fishway designed by us was arranged in the right bank of reservoir area and far away from the electricity generation hole intake upstream about 280 meters in order to induce the fish entering the fishway
根据试验和观察表明,鱼类洄游时大都沿岸上溯,同时应远离泄水道,故我们的鱼道进出口是布置在库区右岸,离发电洞进口上游约280米处,以利诱导鱼类进入鱼道。 - According to in - situ construction real time observation and inverse analysis results , refinement numerical artificial analysis on a group of headrace tunnels was conducted and influence of different construction schemes and support parameters on rock mass deformation and failure behavior were researched to provide quantized data and technical aid for project construction decisions
基于跟踪施工的现场实时观测和反演分析结果,对引水发电洞群进行了精细化数值仿真分析,研究了不同施工方案和支护参数对岩体变形、破坏特性的影响,以便为工程的施工决策提供量化资料和技术支持。