×

前壳 meaning in Chinese

front housing

Examples

  1. Front case of vacuum booster
    助力器前壳
  2. The article calculate the sale income , gross cost , income , cash flow , internal rate of return , net present value , payback period in etc . then i contrast analysis result of calculating with one of feasibility study and national standard , i have got a conclusion to analysis though ca7200e3 transformation - shell project from 2000 to 2005 management result can not achieve than assume , but this project management result is better than national standard . in conclusion the project is successful . 38 - 40 as proceeding the assessment , the article also gives many suggestion on the future of the project . i have a lot analysis from several aspect , they includes project background analysis , market analysis , project condition analysis , finance analysis , etc . these analysis prove that the project is feasibility
    论文比较分析ca7200e3变速器整体前壳项目可研预期与项目实际运行的符合度,找出项目实际运行与可研预测之间偏差产生的原因;论文首先对项目立项决策科学性、产品技术方案可靠性、原材料供应经济性、组织机构和人力资源配置合理性进行了综合评价;然后对项目建设中费用、进度、质量、合同、信息管理工作存在问题进行了系统分析评价;接下来对项目运行状况从产量、效益多方面进行分析,找出项目运行中存在的主要问题,并分析了问题产生的主要原因;最后在项目产品未来发展需求预测基础上结合项目立项后评价、建设后评价、特别是运营状况后评价所发现的问题,对如何提高该项目管理水平给出了相关建议。

Related Words

  1. 前科资料
  2. 前科罪
  3. 前壳体
  4. 前壳体组件
PC Version

Copyright © 2018 WordTech Co.