分期施工 meaning in Chinese
stage construction
Examples
- 8 . the influence of cross - joint and process of constructing and storing water by stages on dam structure were studied with the consider of ertan arch dam and some valuable results were obtained
结合二滩拱坝,研究了坝体横缝和分期施工分期蓄水过程对拱坝结构工作性态的影响,取得的有参考价值的成果。 - Pao - an temple , generally known as " ta - lon tong ta - tao - gon temple , " is located at ta - lon tong . in the 7th year of chienlung ( a . d . 1742 ) , the immigrants from tung - an brought over the split of spiritual powers of the emperor pao - shen from chee - chi temple located at pai - chiau , tung - an county , fukien province , to be sacrificed at ta - lon tong
保安宫祀奉保生大帝,建于清嘉庆十年(西元一八零五年) ,同安籍民由邑之白礁乡分灵来台,内部的石材、木材均由大陆海运来台,分期施工历经了二十五年才于道光十年兴建完成。 - In the aspect of the choice of the comprehensive network schemes , it proposes to have the whole communication network categorized into backbone networks and specialist networks , due to the fact that city ' s trail transportation involves vast investment and lengthy construction and must be implemented line after line , period after period , etc . how to connect pots of specialist networks to backbone network so as to effect business transmission across lines has also been discussed
3 、网络总体方案的选择比较:针对城市轨道交通的建设投资大,时间跨越长,分线、分期施工建设的特点,将城市整个通信网分成骨干网和专线网。在骨干网中如何将各专线网的一个或多个骨干节点组合,实现跨线的业务传输。