典型断面 meaning in Chinese
sample section
typical section
Examples
- Besides , typical section model of wall - rock sector is built together with considering four different kinds of excavation in order to carry out the plane numerical simulation research of construction mechanics
并通过建立类围岩地段隧道典型断面模型,分别考虑四种不同的开挖方式,进行施工力学平面数值模拟研究。 - On this basis , puts forward a kind of scheme and idea of displacement ventilation using in high - speed railway air - conditioned car , makes numerical simulation on the flow field of the car and calculates the pmv value of the typical section
在此基础上,提出了下送风用于高速列车空调的一种方案和构想,并对设计方案的流场进行了数值模拟与典型断面的pmv值计算。 - What ’ s more , this paper takes the effect of crown wall rock and mid - board foundation reinforced parametric variation on tunnel structure stress and stability into account grounded on building typical section model of i wall - rock sector
另外,本文还通过建立类围岩地段隧道典型断面模型,分别考虑拱顶围岩和中墙地基加固参数的变化对隧道结构受力和稳定性的影响。 - A test has been carried out on three typical bridges sectional models of flutter derivatives to find the general rules with the change of flutter derivatives of the bridges sectional model . and it has been discovered that this change depend on the torsional damping , an element closely relating to the h * 2 and a * 2 4
通过对三种典型断面颤振导数的测试,考查了各颤振导数随断面形状的变化趋势,说明了最主要的变化体现在与扭转阻尼有关的h _ 2和a _ 2项。 - Due to complex and varied geological conditions for 4 headrace tunnels at zipingpu project , real time monitoring technique was used during informatization construction according to new austrian tunneling method , system observation for typical sections was conducted by following in - situ construction , based on which inverse analysis for rock mechanics parameters was conducted
针对紫坪铺工程4条引水发电隧洞复杂多变的地质条件,采用新奥法隧洞信息化施工中倡导的实时动态监测技术,跟踪现场施工进行了典型断面的系统观测,在此基础上进行了围岩宏观力学参数的反分析研究。