关键路线法 meaning in Chinese
cpm=critical path method
crm
Examples
- Cpm critical path metho
关键路线法 - Critical path method
关键路线法 - Aiming at the concrete need in srttep construction and embodying the managing theory of the combination of the prearranging programming and comprehensive control , the article proposes the cpm - based schedule operating program of srttep on the basis of the relationship among schedule program , cost and quality which thus realizes the close combination of schedule program and project control ; based on the comparative analysis of experience estimation method , factor estimation method , wbs estimation method and comparison estimation method , the cost controlling strategy is worked out that attaches importance to the srttep cost budget and market economy situation . meanwhile , comprehensive quality management theory is introduced in the project " s schedule program . aiming at subsidiary project bidding , equipment purchase , essential quality inspection , detailed quality insurance system and rules are worked out so as to achieve the goal of high - quality construction of srttep
( 3 )针对川塔项目施工建设具体需要,在充分体现项目事前规划与全面控制相结合管理思想和所进行的项目wbs结构分解基础上,基于项目进度? ?费用成本? ?质量三者之间的关系,提出了基于cpm关键路线法的川塔项目进度计划制定方案,实现了进度规划与控制的紧密结合;在对比分析经验估算法、因素估算法、 wbs估算法、类比估算等方法和技术基础上,制定了侧重于预算的川塔项目成本基本规划方法,以及结合市场经济情况的成本控制策略;同时将全面质量管理思想,引入了项目施工方案中,针对子项目招标、设备采购、重点质量监控点等设立了详细的质量保障机制和细则,以确保达到工程优质建设的目标。 - By comparing the results of the living example , it analyzes the inconsequence of the old algorithm about the key line of the fiizzy network and verifies the rationality of the new method based on the new definition advanced . it offers a new means to calculate project time limit about indefinite item planning - management
通过实例计算结果比较,分析了以前模糊网络关键路线算法的不合理性,证实了本文提出的新的定义下模糊关键路线法的合理性,为非确定性项目计划管理提出了新的工期计算方法。