×

主管工程师 meaning in Chinese

engineer in charge
engineer in-charge
supervising engineer

Examples

  1. Line manager head nurse and supervisors and engineers
    直属经理主管工程师科部主任和上级主管
  2. Conduct new kind of tests ( after reading the instruments manual ) under direction of leading engineer
    阅读仪器说明后,在主管工程师的指导下,进行新类型的测试。
  3. Mr huang got his master degree of engineering surveying at tongji uniersity , his doctor degree of photogrammetry & remote sensing at wuhan technical university of surveying and mapping , was once principal survey engineer at daya bay nuclear power plant in shenzhen , lecturer of surveying engineering of hohai university , and project manager of gis at singapore power ltd . , etc
    黄明智先生是同济大学工程测量专业硕士、武汉测绘科技大学摄影测量与遥感专业博士,曾任深圳大亚湾核电站测量主管工程师、河海大学测量工程系讲师、新加坡能源公司地理信息系统项目经理等职。
  4. A number of reports were presented during the training program , mr . huang yuenan , senior engineer and project manager of the sadp office in the provincial department of agriculture , introduced canadian processes and experience in sustainable agriculture development and also delivered two keynote reports entitled hunan sustainable agriculture development strategies , problems and counter - measures and ngos role in sustainable agriculture development . mr . tang li , director of xiangxi prefecture sadp office , delivered a report entitled problems faced by and counter - measures taken for sustainable agriculture development in xiangxi prefecture . mr . bai yingyan , senior animal husbandry engineer and deputy director of animal husbandry bureau of baojing county , gave a speech entitled borrow canadian advanced animal husbandry technology and develop animal husbandry industry in xiangxi
    培训会上,湖南省农业厅中加可持续农业发展项目办公室项目主管高级工程师黄岳男同志介绍了加拿大可持续农业发展的进程与经验,作了“湖南省可持续农业发展战略及面临的问题与对策”和“非政府组织在可持续农业发展中的作用”的专题报告,湘西州中加可持续农业发展项目办公室主任唐力同志作了“湘西州可持续农业发展面临的问题及对策”的报告,保靖县畜牧局副局长高级畜牧师白应炎同志作了“借鉴加拿大先进的畜牧生产技术,发展湘西畜牧生产”的报告,古丈县中加可持续农业发展项目办公室项目主管工程师周春桥同志作了“借鉴加拿大先进技术,促进湘西可持续农业发展”的报告,湘西州中加可持续农业发展项目办公室经济师田燕同志作了“积极鼓励妇女参与中加可持续农业发展项目建设,提高妇女地位”的报告。
  5. Before embedding of the foundation and embedment parts , technical clarificaiton will be don by the engineer in charge and the working group on the basis of design drawing 、 installation documentation 、 design amendment notification and supervision nofification 、 the principle of no impeded the progress schedule 、 the requirement of the relevant regulations and specification , setting out the embedment locaiton applied by the theodolite 、 water level and tape after that carrying on the embedment process and the record will be well kept
    以设计图纸、设备安装资料及设计修改通知单和监理通知单为依据,按规程规范的要求,以不影响工程进度为原则,由主管工程师对施工班组进行技术交底,利用经纬仪、水准仪和卷尺等测量工具放点定位进行基础及预埋件预埋并做好预埋记录。

Related Words

  1. 单位主管
  2. 报关主管
  3. 次主管
  4. 注册主管
  5. 辅助主管
  6. 主管的
  7. 港口主管
  8. 主管线
  9. 培训主管
  10. 救护车主管
  11. 主管高浩澧
  12. 主管高礼行
  13. 主管公共区域
  14. 主管关荣乐
PC Version

Copyright © 2018 WordTech Co.