主坝 meaning in Chinese
main dam
major dam
Examples
- The seepage analysis and safety accessment of the main dam of sanba reservoir
三八水库主坝渗流分析及安全评价 - Three - dimesional stability analysis of dam foundation of baise hydro - junction
百色水利枢纽主坝坝基三维抗滑稳定分析 - Wireless remote control system of gateway type crane in land - water hub of yangtze river management commission
长江委陆水枢纽主坝门式起重机无线遥控系统 - It has much more advantages in the wet seasons . the main dam is the rolled asphalt rock - fill with the concrete core in nierji project
尼尔基水利枢纽工程主坝防渗型式采用碾压式沥青混凝土心墙坝。 - The main works included 2 dams , one in the east and the other in the west . east dam was 1 , 593 ft . long and 348 ft . high , facing the pacific ocean
工程主要包括东、西面的两条主坝:东坝面对太平洋,长1 , 593尺,高348尺;西坝面对牛尾海,长2 , 470尺,高333尺。