English translation for "试车台"
|
- test bay
test bench testbed
Related Translations:
试车时间: breaking-in periodsetutime 试车桨: club propellerdummy propeller 试车期: breaking-in periodcommissioning periodstart up periodstart-up period
- Example Sentences:
| 1. | Jet engine test cell work experience is preferred 具有发动机试车台经验者优先考虑 | | 2. | Vibration isolation of auto engine test - bed 发动机试车台振动控制 | | 3. | Numerical study on supersonic ejector of simulated altitude test stand 高空模拟试车台超声速引射器数值研究 | | 4. | Spinning test stand is difficult to simulate the flow field of srm under high acceleration condition because of its coriolis acceleration 理论分析证明旋转试车台不能克服科氏加速度的影响,难以用来开展高过载条件下发动机流场的地面模拟试验。 | | 5. | The study shows that the nine - component model and nine - component thrust vector stand can improve the precision of thrust vector measurement greatly 研究表明,九分力模型和九分力推力矢量试车台提高了推力矢量测量的精度,适合用于测量大型固体火箭发动机的推力矢量。 | | 6. | At last , the sensor fault diagnostic software of liquid rocket engine ground test system is developed successfully , including the designs of arithmetic , database and interface software 本文开发了液体火箭发动机试车台传感器故障诊断系统,包括算法实现、数据库设计和用户界面设计。 | | 7. | According to the definition and expression of the thrust , as well as the condition derived from them , a method of solid rocket ramjet thrust determination and its program are provided on the basis of engine ground simulation test 本文以西北工业大学固体火箭冲压发动机直连式试车台为研究对象,探讨固体火箭冲压发动机地面试验技术。首先,从推力的定义出发,建立了试验中来流空气流量、燃料流量与固体火箭冲压发动机推力之关系。 | | 8. | This paper focuses on two diagnostic methods for sensor fault : principal component analysis ( pca ) and artificial neural network predictor . three kinds of pressure sensors from hydrogen system are employed to lucubrate pca . the experiments illuminate that pca is effective for typical sensor fault 本文结合试车台氢系统中的三种重要的压力传感器对主元分析法进行了深入研究,通过对典型故障的实验分析证明主元分析法有良好的诊断能力。 | | 9. | What ’ s more , the precision of thrust vector measurement is also calculated , depending upon the error analysis of nine - component model . a large - scale srm hot test is successfully done on the nine - component thrust vector stand . and the satisfactory results validate that the nine - component model is reasonable and the nine - component thrust vector stand design is feasible 在九分力推力矢量试车台上成功地进行了一次大型固体火箭发动机地面热试车,得到了满意的试验结果,验证了九分力模型的合理性和九分力推力矢量试车台设计的可行性。 | | 10. | On the part of the design of nine - component thrust vector stand , an automatic hydraulic pressure original position calibration system , a scheme of original position calibration , and the great rigidity universal flexible combinatorial underprop are designed . by using the scheme of “ universal flexible combinatorial underprop plus software digital filter ” , the inherent frequency of test stand is improved , and the problem of test stand libration is solved . then , the resolving method of the disturbance between underprops of the moveable frame is proposed , and the disturbance revise equation is deduced 在推力矢量试车台设计方面,设计了自动液压原位校准系统、原位校准方案以及大刚度万向柔性组合支撑;采用“万向柔性组合支撑+软件数字滤波”的方案,提高了试车台动架的固有频率,解决了试车台动架的振动问题;提出了动架约束互扰问题的解决方法,推导了互扰修正方程;研究了九分力推力矢量测量误差分析方法,并计算了推力矢量测量精度。 |
- Similar Words:
- "试车时间" English translation, "试车试运转" English translation, "试车手记" English translation, "试车数据" English translation, "试车速度" English translation, "试车台的真空度" English translation, "试车台点火" English translation, "试车台点火试验" English translation, "试车台功率" English translation, "试车台火焰反射器" English translation
|
|
|