English translation for "地面高程"
|
- exist ground level
ground height level of the floor surface elevation
Related Translations:
设计高程: desiged dldvationdesign elevation 高程位移: relief displacement 高程线: altitude traversehypsographic curvehypsometric curve 测压管高程: piezometric elevation 高程要素: hypsographic features
- Example Sentences:
| 1. | Extraction of the elevation from single sar image 从单幅雷达影像提取地面高程信息 | | 2. | Assumed ground elevation 假定地面高程 | | 3. | Finished ground level 粉刷地面高程 | | 4. | Exist ground level 现有地面高程 | | 5. | Study of triangulated irregular network andinterpolating terra in elevation in railway location 铁路线路三角网数模及地面高程内插系统研究 | | 6. | 5 by using multi - window programming technology to combine vc + + with autocad , this thesis implemented comparison of plane , profile and across section , interactive design of profile , railway location by across section and setting location of bridge and tunnel . 6 this thesis expounded itself viewpoint on application model of profile optimization in scrlid , and has been used in system development . 7 by putting forward the summaries on the application model of professional design , this thesis established mathematics model of calculating terrain height of profile and across section , automatic setting location of the bridge and the tunnel 2 、用面向对象的数据封装和继承技术实现了项目管理和方案数据的安全保护; 3 、选择应用vc + + dao数据库应用技术,完成了方案比选共用数据库的开发; 4 、用autocadobjectarx定制实体技术,实现了线路平面拖放式交互设计; 5 、用vc + +与autocad相结合的多窗口编程技术,实现了平面、纵断面、横断面三种图形的对比显示,实现了纵断面交互设计、横断面定线和桥隧工程设置; 6 、就纵断面优化在线路方案比选工作中的应用模式提出了自己的观点,并在系统开发中得到应用; 7 、总结专业设计应用模式,建立了内插纵横断面地面高程、自动设桥、自动设隧数学模型。 | | 7. | In the fourth chapter , based on the analysis and design of some modules closely relating to interactive design , the thesis completes the development of the railway location interactive design subsystem , and these modules are : railway horizontal line interactive design , comparison of plane , profile and across section , automatic and interactive design of profile , designing railway location by across section and setting location of the bridge and the tunnel 第三章分析了线路方案比选工作过程中所涉及的数据情况以及数据管理方法,完成了方案比选综合数据管理子系统的开发工作,第四章通过对线路平面交互设计、内插纵横断面地面高程、纵断面自动与交互设计、横断面定线、桥隧工程设置等与交互设计密切相关的重点模块的分析与设计,完成了交互式线路设计子系统的开发。 | | 8. | We describe three static methods : field primary static correction , refraction statics and automatic residual statics , and then introduce the principle of the three static methods . second , the dissertation gives the method of elevation statics , calculating static values by using minor refraction data , first - break pickup method and residual technique 其次,重点阐述了1 、野外静校正方法中地面高程校正的过程、利用小折射测量数据计算低降速带静校正量的算法; 2 、应用现有的折射波静校正软件进行初至拾取及静校正量计算的操作要领; 3 、自动剩余静校正多次迭代技术。 | | 9. | In order to direct the water to the forebav of the pump station from the original canal , a channel long 135 m is designed . it crosses through the terrain top with a depth of more than 50 m . soil of the channel slopes is a strongly - weathered silty and sandy mudstone with many well - developed reticular cracks and takes the structural surfaces almost same as the channel slopes 东深供水工程金湖泵站位于塘厦镇东面,属低山、残丘地貌,地面高程22 60m ;泵站前池进水渠横切山脊,连接原东深供水河,设计开挖1条长135m的进水渠,坡高50多米,边坡土质为强风化的粉砂质泥岩,网状裂隙发育,结构面基本与坡面重合;坡体土质中含有较多的粘土矿物,具有遇水软化的特性。 |
- Similar Words:
- "地面干扰器" English translation, "地面干涉仪" English translation, "地面感应器" English translation, "地面感应器, 线路感应器" English translation, "地面钢罐内储油" English translation, "地面高程以上" English translation, "地面高度" English translation, "地面割裂度" English translation, "地面跟踪" English translation, "地面跟踪雷达" English translation
|
|
|