Mobile
Log In Sign Up
Home > chinese-english > "tunnel work" in English

English translation for "tunnel work"

开挖隧道
隧道掘进工作


Related Translations:
tunnel correction:  风洞影响修正
undersea tunnel:  过海隧道海底隧道
grade tunnel:  缓坡隧洞有水力梯度的隧洞
tunnel form:  隧道模板
medium tunnel:  中长隧道
tunneling effect:  穿隧效应
underground tunnel:  地下隧道
avalanche tunnel:  雪崩隧道
sewer tunnel:  排水隧道排水隧洞污水隧洞污下水道隧洞
freezing tunnel:  冻结隧道隧道式冷冻装置
Example Sentences:
1.Effect of keeping core soil on stability of tunnel working face
沉管干振挤密抗拔防浮碎石桩抗拔试验研究
2.Sewage tunnel works
污水隧道工程
3.The panels also discussed the papers on the progress of tunneling works under the stage i of ssds
两个事务委员会亦讨论有关下列事宜的文件:策略性污水排放计划第一期隧道工程进展
4." milky stagnant water shown in the picture of one of the press reports is actually the sedimentation pond of west rail s tai lam tunnel works
发言人表示,有关报道内的照片显示一池奶白色的死水实为大榄隧道工程的沉淀池。
5.The ground water inflow into the tunnelling works is settled and filtered to acceptable level prior to discharge into kam tin river , " he said
从隧道工程产生的水流,会经过处理、多重沉淀和过滤,至水质合符标准,才会排放至锦田河。
6.The panel discussed the current status of ssds , in particular progress of the stage i tunneling works and the way forward for stages ii , iii and iv
事务委员会讨论有关策略性污水排放计划的最新情况,特别是第i阶段污水管道工程的进度和第ii iii及iv阶段的未来路向。
7.The panel discussed the current status of ssds , in particular progress of the stage i tunneling works and the way forward for stages ii , iii and iv
事务委员会讨论有关策略性污水排放计划的最新情况,特别是第i阶段污水管道工程的进度和第ii 、 iii及iv阶段的未来路向。
8.The fundamental characteristic of tunnel design is geological & environmental complexity and inadequate of basic information , the construction of tunnel works has great uncertainty and high risks
隧道工程设计的基本特点是“地质环境复杂,基础信息缺乏” ,其施工存在着很大的不确定性和高风险性。
9.The panels discussed the recent problems encountered in the tunnelling works project under the strategic sewage disposal scheme ssds stage i and expressed concern on the consequential delay in completion of the project
两个事务委员会讨论策略性污水排放计划第i阶段的隧道挖掘工程最近出现的问题,并对该等问题引致工程完成日期受到延误一事表示关注。
10.The panels discussed the recent problems encountered in the tunnelling works project under the strategic sewage disposal scheme ( ssds ) stage i and expressed concern on the consequential delay in completion of the project
两个事务委员会讨论策略性污水排放计划第i阶段的隧道挖掘工程最近出现的问题,并对该等问题引致工程完成日期受到延误一事表示关注。
Similar Words:
"tunnel waterproofing waterproofing of" English translation, "tunnel wave" English translation, "tunnel well" English translation, "tunnel winding" English translation, "tunnel windings" English translation, "tunnel worm" English translation, "tunnel(foraminifera)" English translation, "tunnel-bearing grease" English translation, "tunnel-diode" English translation, "tunnel-diode circuit" English translation