| 1. | Fuzzy iteration methodology of road network programming schemes and application blue 路网规划方案的模糊迭代方法及应用 |
| 2. | In the end of the paper , the complete & specific set of hardware circuits and software program scheme is presented 该论文给出了具体的系统设计方案及相应的软硬件实现方法。 |
| 3. | A hybrid fuzzy - goal programming scheme for continuum topology optimization with static and dynamic objectives was proposed 摘要提出了连续体结构静力学和动力学多目标拓扑优化设计的模糊目标规划方法。 |
| 4. | Part 2 of this series examines in more detail how to program scheme macros and how they can make your large - scale programming tasks significantly easier 本系列文章的第2部分将详细介绍如何编写scheme宏,以及如何使用这些宏来极大地简化大型编程任务。 |
| 5. | Take puts the winding up roller as the research object , has made the detailed analysis to its state of motion and a program scheme for calculating the tension control torque was provided 以放卷辊为研究对象,对其运动状态作了详细的分析,进而给出了计算控制力矩的程序框图。 |
| 6. | In order to narrow the wide distribution of the erasure threshold voltage and eliminate the over - erased cells , a self - convergence soft - programming scheme is also proposed 论文同时还提出一种新型的自收敛sibe软编程操作模式,对过擦除存储单元的阈值电压分布具有很好的收敛效果。 |
| 7. | This paper makes a deep research in the software and hardware realization of fault location system with radial feeders , stressing on the design of the hardware system and software programming scheme 本文对基于“递进信息法”的配电网馈线故障定位系统的硬、软件实现进行了较深入的研究,重点设计了硬件系统和软件编程方案。 |
| 8. | It give expression to arrange program through network picture , arid select the best program scheme through it , organize , harmonize and control the rate of progress and expenditure of the work , make it get to the anticipative target 它通过网络图形式,表达计划安排,并据以选择最优的计划方案,组织、协调和控制生产(工作)的进度和费用,使之达到预定的目标。 |
| 9. | The original multi - objective optimization problem can be converted to a single objective problem using the goal programming scheme , and the nonlinear membership function is applied to embody uncertain and stochastic characteristics of the aspiration levels in the goal programming model 该方法利用目标规划方法将多目标优化问题转化为等效的单目标问题,并用模糊集理论中的非线性隶属函数来体现目标规划方法中目标函数期望值所具有的模糊性和不确定性。 |
| 10. | In the module of data management , the ado programming technology was combined with access database to sort and manage the data . in data processing module , the matlab and vc + + co - programming scheme was presented in which the original data were transformmed geometrically so that the 3d data model was established . the graphical display module was developed on the base of opengl and vc platform with which the 2d geological drawings and 3d geological drawings could be accomplished 在数据管理模块中,选用ado数据库开发技术,结合使用access数据库对数据进行分类管理与存储;在数据处理模块中,提出了利用matlab vc ~ ( + + )联合编程的方案,通过使用matlabc c ~ ( + + )数学函数库完成了反演数据的几何变换以及三维数据模型的建立;在图形显示模块中,以图形接口opengl作为绘图语言,在vc平台下进行开发,实现了二维地质图件和三维地质图件的绘制。 |