Mobile
Log In Sign Up
Home > chinese-english > "plating beam" in English

English translation for "plating beam"

板构横梁
Example Sentences:
1.Construction technology of pre - stressing concrete hollow plate beam precasted by monolithic tension method
整体张拉法预制预应力混凝土空心板梁
2.This thesis will emphasis research the technique of reinforcing experiment test on the top - bear type armor plate the beam , especially to the 40 - meter top - bear type armor plate beams of the big bridge of yellow river of zhengzhou
本文重点研究上承式钢板梁特别对京广郑州黄河大桥40米上承式钢板梁的加固技术实验测试。
3.With the actual locale incestigating , the actual locale testing and the theories analyzing of the reason of the diseases producing of the exceed limit of horizontal swing and steel pole ' s break , and summaried the reinforcing measure of the top bear armor plate beam
通过对京广线郑州黄河大桥40米上承式钢板梁横向摆动严重超限及钢梁杆件断裂等情况的现场调查、现场测试和理论分析及病害原因产生的机理,总结提出了上承式钢板梁的加固措施。
4.For do n ' t delive the horizontal power , connect method adopt the double hingle connect , and made both girder just to deliver the horizontal power each other , and vertical power can change position , this the problem that the top bear armor plate beam do n ' t accommodate the increasing in speed had been resolved radical
为了不传递竖向力,连接方式采用双铰接,使两孔梁只能相互传递横向力,竖向可以变位,从而基本解决了上承式钢板梁不适应提速问题。
5.Therefore , the light steel portal frame system is compared comprehensively to the bent frame system of solid - web steel column and solid - web steel plate beam , the bent frame system of solid - web steel column and open - web steel pipe truss , as well as the system of rc column and open - web steel pipe truss
因此对中小型单层厂房中实腹式钢柱加实腹式钢板梁排架体系,实腹式钢柱加空腹钢管桁架排架体系以及钢筋混凝土柱加空腹钢管桁架排架体系与轻钢门式刚架进行了综合比较。
6.Based on a series of testing , examination , research and analysis conducted how to lift the speed on nanking section , jinhu road , we explore the possibilities of solving the obstacles of nanking segment of bridges for realizing railroad speed - lift soon due to its subframes and steel plate beams . we produced authentic and convincing data . 3
通过对京沪线南京段部分桥梁为实现铁路提速而进行的一系列实验、检测、研究和分析,探讨了成为制约干线提速瓶颈的下承钢板梁及半穿式钢桁梁进一步提高运行车速的可能性,为此类结构的桥梁提速提供了可信的依据。
7.In view of the construction peculiarity of non - bracket construction trait of y - shape pier upper plate beam in goughexin road viaduct project , the author uses the beam - rod finite element to calculate the whole construction period by steps , compares the result with engineering practice , and finally proves , the calculation can offer reference for the construction and design of non - bracket upper plate beam
摘要针对共和新路高架桥y型墩上盖梁无支架的施工特点,采用梁杆单元,对上盖梁施工过程的各工况进行了分步计算,并与现场测试结果进行比较, ?上盖梁无支架施工设计提供依据。
8.Considering special form of the boiler frame , the reconstruction and enforcement method , in addition dynamic analysis are given by particular steps : establishment of the model of boiler steel frame , determination of earthquake loads and distribution form , and anti - side force system for the frame to model and analyze , involving loads on the frame and above it , earthquake loads , damping , sway control installation , hanging bar and plate beam
考虑锅炉构架钢结构的特殊形式,研究并提出了电站锅炉钢结构改造加固研究方法,及动力分析的具体步骤:建立了锅炉钢结构动力分析模型、地震荷载分析方法、建立了锅炉钢结构布置型式、及整个锅炉钢构架抗侧力体系模拟分析方法。具体包括:钢构架本体及构架上荷载、地震载荷与阻尼系数确定、制晃装置确定、吊杆与大板梁简化。
Similar Words:
"plating and heat treatment" English translation, "plating attachment" English translation, "plating barrel" English translation, "plating bath" English translation, "plating bath control" English translation, "plating brittleness" English translation, "plating case" English translation, "plating crack" English translation, "plating culture" English translation, "plating department" English translation