Application of the art of anti - seepage wall by jet cement with high pressure in flood control project 高压喷射注浆法在公路工程施工中的应用
2.
The soft ground need to be treated in order to satisfy the demands of the settlement after loading of the highways because of its low bearing capacity and great deformation . the dry - jetted cement mixing pile ( djcm pile ) is one of the effective ways to reinforce the soft ground 软土地基由于其承载力低,受荷载作用后产生很大的变形,并且要持续较长时间长能稳定,往往需要进行人工处理才能使公路的工后沉降满足规范的要求。