| 1. | A tentative study on environmental vicissitudes in gonghe basin 共和盆地环境变迁初探 |
| 2. | Construction monitoring and controlling of gonghe cable - stayed bridge 公和斜拉桥施工控制 |
| 3. | Ecological water demand of gonghe basin in qinghai province 青海共和盆地生态需水研究与计算 |
| 4. | The modified calculation about cable ' s angle and force of gonghe bridge is done . 5 对公和桥拉索的索力和倾角进行了垂度修正计算。 |
| 5. | Factory add : f4 , 48 , gonghe rd , yingtian industrial zoon , xixiang , baoan district , shenzhen 工厂地址:深圳宝安区西乡银田工业区共和路48号4楼 |
| 6. | The calculation and construction of cable force adjustment of gonghe cable - stayed bridge after closure are studied 对公和桥合拢后索力调整的计算及实施过程进行了深入研究。 |
| 7. | Because of the environmental change and population rise , the issue of desertification becomes very serious in gonghe basin , qinghai 近年来,由于环境变化和人口剧增,青海共和盆地的荒漠化问题已日益严重。 |
| 8. | In addition , comprehensive comments of gonghe cable - stayed bridge construction progress calculation , implement and tolerance analysis has been done 另外,本文还对公和斜拉桥的施工控制计算、施工控制的实施以及误差分析进行了全面地论述。 |
| 9. | The construction space for gonghe cable - stayed bridge is not enough because it crosses over the main hada electric railway which is under reconstruction 沈阳市公和斜拉桥横跨铁路主干线,加上哈大电气化铁路改造等原因,导致桥下施工净空不足。 |
| 10. | The cable forces design and cable forces adjustment in design and construction of gonghe bridge are maily studied in article . the following work has been done : 1 本文着重对公和桥在设计和施工控制中的索力的确定与调整进行了研究,做了如下工作: 1 |