| 1. | Test method for determining open assembly time of carpet mastic adhesives 测定地毯胶合铺料粘合剂的开放装配时间的试验方法 |
| 2. | Closed assembly time 叠装时间 |
| 3. | Prc - assembly time 预组合时间 |
| 4. | Open assembly time 晾置时间 |
| 5. | Adhesives for load - bearing timber structures - test tethods - determination of the conventional assembly time 承载木结构用粘合剂.试验方法.传统组装时间的测定 |
| 6. | Adhesives for load - bearing timber structures . test tethods . determination of the conventional assembly time 承重木材结构件用胶粘剂.试验方法.常规组装时间的测定 |
| 7. | Analyze and balance the direct labor of the assembly lines . define and stipulate the standard assembly times for the assembly operation 分析及平衡组装生产线的工人数量,确定组装的标准时间 |
| 8. | Adhesives for load - bearing timber structures - test methods - part 5 : determination of the conventional assembly time ; german version env 302 - 5 : 2002 承载木结构粘胶剂.试验方法.第5部分:正常组装时间测 |
| 9. | Special products for hydraulic concrete constructions . products for making structural joints between two concrete elements . test for determining the maximum assembly time 水硬性混凝土建筑用的特殊产品.粘结两块混凝土的产品.最大粘合时间测试 |
| 10. | While being able to specify transaction demarcation separate from the code is a very powerful feature , making poor decisions at assembly time can render your application unstable or seriously impair its performance 尽管能够指定与代码分开的事务划分是一种非常强大的功能,但在装配时做出不好的决定会使应用程序变得不稳定,或者严重影响它的性能。 |