| 1. | A dead-weight tester is shown in fig. 8 . 静重试验器如图8所示。 |
| 2. | The studies may indicate that an earthfill dam with a center concrete gravity overflow spillway section is the most economical, in a wide flat valley . 方案表明,在宽阔而平坦的河谷内,一种在中间段设置混凝土重试溢洪道的土坝是最经济的。 |
| 3. | Loading test of accommodation ladder ( pilot ladder ) 舷梯(引水员梯)压重试验。 |
| 4. | The initial wait time for a retry is a few seconds 重试的初始等待时间只有几秒。 |
| 5. | Quit the protected - mode software and try again 退出保护模式的软件,然后重试。 |
| 6. | Interval , in seconds , to wait between retries 两次重试之间的等待间隔(秒) 。 |
| 7. | The full - text gatherer will retry the row later 全文收集器稍后将重试该行。 |
| 8. | Running test and loading test for 4t provision crane 4吨食物吊运转试验和吊重试验。 |
| 9. | Queueing system with general operation and vacation time 1重试可修排队系统 |
| 10. | The name of the host could not be resolved 无法解析主机名。请稍后重试。 |