Mobile
Log In Sign Up
Home > chinese-english > "第一主应力" in English

English translation for "第一主应力"

first principal stress
major principal stress


Related Translations:
主应力:  main stressmajor stressprimary stressprincipal stressprinciple stressprinipal component of stressprinipal stress
径向主应力:  radial principal stress
有效主应力:  principal effective stress
主应力轴线:  trajectory
小主应力:  minor principal stress
主应力轨迹:  trajectory of principal stresstrajectory of the principal stress
最大主应力:  greatest principal stressmajor principal stressmaximum principal stress
总主应力:  total major stress
平均主应力:  mean principle stress
主应力轴:  axes of principal stressesaxis of principal stressprincipal axes of stressesprincipal axis of stress
Example Sentences:
1.3 . under different kinds of wall rock and the same condition , from ii iii v kinds of wall rock , and conditions of construction period and operation period , it gradually increases that the maximum of displacement and the first main stress third main stress of pipe liner structure
3 、不同种类围岩在相同的工况下,从、 、类围岩看,不论是施工期还是运行期,管片衬砌结构的位移的最大值和第一主应力、第三主应力最大值都逐渐增大。
2.1 . under the same kind of wall rock and the same condition , displacement of pipe liner is symmetry , for tunnel structure and suffered load are symmetry . as level terra stress is bigger , the maximum of displacement and the first main stress occur in tie - in of pipe liner structure , and its direction is radial and points in hole ; the direction of the third main stress is annular and its maximum occurs in top and bottom hole inner
1 、同一类围岩在同一种工况下,由于结构和荷载的对称性,管片衬砌结构的位移也表现出对称性,因水平向地应力较大,位移最大值、第一主应力的最大值发生在管片衬砌结构的接头处,方向为径向指向洞内;第三主应力的方向为环向,较大值发生在洞顶和洞底内侧。
3.2 . under the same kind of wall rock and different conditions , the maximum of displacement and the third main stress of pipe liner structure in construction period is bigger than these of operation period , and the maximum of the first main stress of pipe liner structure in construction period is smaller than these of operation period
2 、同一类围岩在不同工况下,施工期管片衬砌结构位移的最大值、第三主应力最大值比运行期要大,施工期的管片衬砌结构的第一主应力最大值比运行期要小。
Similar Words:
"第一主驱动器" English translation, "第一主题" English translation, "第一主线串" English translation, "第一主要弧" English translation, "第一主应变" English translation, "第一柱" English translation, "第一助理导演" English translation, "第一助理剪辑" English translation, "第一助理摄影师" English translation, "第一助手" English translation