Mobile
Log In Sign Up
Home > chinese-english > "竣工决算" in English

English translation for "竣工决算"

budget needed for the completion of projects
final account for completed project


Related Translations:
竣工:  (of a project) be completed 短语和例子提前竣工 have been completed ahead of schedule; 竣工测量 acceptance survey; 竣工面积 floor space completed
竣工坡度:  finished grade
竣工期:  time of completion
竣工测量:  acceptance surveyfinal construction surveyfinal surveyfinalco tructio urveyfinish comstruction surveyfinish construction survey
竣工厚度:  finished thickness
提前竣工:  have been completed ahead of schedule
坏竣工:  mc mechanical completion
竣工奖金:  bonus for completion
分期竣工:  completion by stages
竣工报告:  statement at completion
Example Sentences:
1.How to deal with the final accounts of completion for construction projects
浅析建设项目竣工决算审计与建设工程竣工结算审核的区别
2.Brief discussion on final accounts and audit after the completion of flood control projects
对水利基本建设项目竣工决算有关问题的探析
3.The preparing method of the implementing scheme for completes and final accounts of the capital projects of water conservancy
水利基本建设项目竣工决算审计实施方案的编制方法
4.Construction cost consultation ; editing and auditing of financial projects ; construction auditing ; wholly evaluation of assets ; estate appraisal
工程造价咨询与管理竣工决算的编制与审核,工程审计,企业资产的整体评估与房地产估价。
5.Interest of loan and other related expenses for acquiring fixed assets , and the exchange difference from conversion of foreign currency loan , if incurred before the assets having been put into operation or after been put into operation but before the final account for completed project is made , shall be accounted as fixed assets value ; if incurred after that , shall be accounted into current profit or loss
在固定资产尚未交付使用或者已投入使用但尚未办理竣工决算之前发生的固定资产的借款利息和有关费用,以及外币借款的汇兑差额,应当计入固定资产价值;在此之后发生的借款利息和有关费用及外币借款的汇兑差额,应当计入当期损益。
6.Interest of loan and other related expenses for acquiring fixed assets , and the exchange difference from conversion of foreign currency loan , if incurred before the assets not having been put into operation or after been put into operation but before the final account for completed project is made , shall be accounted as fixed assets value
在固定资产尚为交付使用或已投入使用,但尚未办理竣工决算之前发生的固定资产的借款利息和相关费用,以及外币借款的汇兑差额,应当计入当前损益。
7.The thesis takes apart the relation of the construction project ' s benefit and venture assessment . it sums up the content and process of the final accounting of a construction project completion , and bring forward some good advice on the construction company finance management , which take on important significance in the practice operation on the construction company finance
本文重点说明了工程项目资本金结构的确定方法和原则;剖析了工程项目经济效益和风险控制的关系,详细研究了项目风险评价的原则和办法;总结了工程项目竣工决算的程序和内容,对建设单位财务管理提出了一些有益的探索和建议。这对建设单位财务人员进行具体操作具有重要的指导意义。
Similar Words:
"竣工检验标准" English translation, "竣工奖金" English translation, "竣工奖金;完工奖金" English translation, "竣工结论" English translation, "竣工结算" English translation, "竣工零件" English translation, "竣工楼面" English translation, "竣工楼面;修整过的楼面" English translation, "竣工面积" English translation, "竣工年" English translation