| 1. | The scheme is a transition between the box girder with vertical piers and the true arch . 该结构是具有垂直墩的箱梁桥钢与真正的拱桥之间的一种过渡形式。 |
| 2. | Numerical simulation on bridge under a moving load 梁桥受移动荷载作用的数值模拟 |
| 3. | Model test of pc continuous curved box girder 预应力混凝土连续曲线箱梁桥模型试验 |
| 4. | The optimum analysis in designing a steel box beam 钢结构箱形梁桥结构尺寸优化分析 |
| 5. | The manufacturing process of one beam bridge crane 单梁桥式起重机的制造工艺 |
| 6. | Bearing capacity reliability for existing beam - bridge 基于等待梁法的在用梁桥承载力可靠度 |
| 7. | Study of structure behavior of skew girder bridge 斜梁桥结构行为研究 |
| 8. | Static test research of long - span continuous box - girder bridges 大跨径连续箱型梁桥静载试验研究 |
| 9. | Strengthening of a reinforced concrete continuous box girder bridge 钢筋混凝土连续箱梁桥的加固 |
| 10. | Study on the method of linear and circular vectorization 薄壁箱形梁桥剪力滞效应的能量变分法研究 |