| 1. | Control of early crack on beam - and - slab construction with ready mixed concrete 商品混凝土梁板结构施工早期裂纹控制初探 |
| 2. | Analysis and solution to early cracks in the beam plank during construction 商品砼土梁板结构施工早期裂纹的分析和防止措施 |
| 3. | Beam and slab structure 梁板结构 |
| 4. | Experimental study on properties of 16m pretensioned and prestressed concrete beam - slab structure 先张法预应力砼梁板结构性能试验研究 |
| 5. | These experiments mainly aim at determining the deflection and stress of beam slab structure before and after reinforcement 静载试验的内容是测定加固前后梁板结构的混凝土应力和挠度。 |
| 6. | Finite element model is also established based on a cabin of a warship ( from # 126 to # 132 ) and is solved by the fem program coded by myself 并针对某一军舰的# 126 - # 132舱段,建立了空间梁板结构的有限元模型,采用自编的有限元程序,得出了该结构的节点位移。 |
| 7. | In this paper , static load experiments are illustrated and the reliability of cfrp reinforcement technology , used for reinforcing beam slab structure of large span bridge , is discussed 文章结合对大跨度桥梁的梁板结构加固处理前后的静载试验,探讨了大跨度梁板结构应用粘贴碳纤维加固处理技术的可靠性。 |
| 8. | Through an actual case of re - construction of a workshop in a coal preparation plant without interrupting the production , where cf reinforcement technique was applied , the computing verification of the reinforced concrete beams and manipulation of cf materials in construction are introduced in this paper 摘要通过对某矿选煤厂准备车间在不停产状态下施工实例,应用碳纤维加固技术,对梁板结构进行了结构计算验证,并对碳纤维加固施工进行了介绍。 |
| 9. | All the researched results prove the era method is steady and suitable for those structures : spacecraft 、 beam - plane structure 、 truss structure 、 frame 、 bridge , etc . on the basis of the consideration of the above , the major job of the article is to discuss how to identify the parameters of the long - span structure with the method of era under the action of the wind loads 但是,国内外已有的相关文献,对于下面的结构均进行了相关的研究,如航天器、梁板结构、桁架、框架、桥梁等。基于以上考虑,本文主要工作,就是探讨在风激励荷载作用下,如何用era算法识别大跨空间网格屋盖结构的模态参数。 |