Mobile
Log In Sign Up
Home > chinese-english > "支承压力" in English

English translation for "支承压力"

abutment pressure
arch pressure
bearing pre ure
bearing pressure
bearingpre ure
end pressure
force of support
su ort pre ure
support pressure


Related Translations:
支承平面:  su orting planesupporting plane
支承面:  area of bearingbearing facebearing surfacebearingsurfacebinding facecarrying pistoncarrying planecontact surfacegripping facelifting surfacesu orting surfacesupporting areasupporting pisto
支承栓塞:  aufnahmestopfen
支承应力:  bearing stressbearingstre
支承缆索:  supporting rope
临时支承:  temporary support
支承角钢:  shelf anglesupporting angle steel
弹簧支承:  spring-loaded
支承辊:  anvil rollback rollback up rollbacking rollbacking up rollsupport rollsupporting rollertrack carrier rollers
支承膜:  support membrane
Example Sentences:
1.Formation and application of the front abutment pressure on longwall face
论采场前方支承压力的形成及应用
2.Numerical simulation study on the distribution of abutment pressure in fully - mechanized caving face
综放面侧向支承压力分布规律模拟研究
3.Study on distribution laws of stress in inclined coal pillar for fully - mechanized top - coal caving face
综放面倾向煤柱支承压力分布规律研究
4.Abutment pressure distribution and its transfer law in floor of deep isolated fully - mechanized mining faces using sublevel caving
深井孤岛综放面支承压力分布及其在底板中的传递规律
5.Surrounding rock abutment pressure distribution and thickness effect of dynamic catastrophic in fully mechanized sublevel mining stope
综放采场围岩支承压力分布及动力灾害的层厚效应
6.Through theoretical analyses in the article , the highly tough top - coal deflection before destroying is in inverse proportion to elastic mould , in direct proportion to tensile strength , and the conclusion that bigger deflection roof can ' t sufficiently transmit the compressible support to top - coal is drawn
通过理论分析,获得了高韧性煤层煤体在破坏前的挠度与弹性模量成反比,与抗拉强度成正比的关系,并得出挠度较大的顶板不能很好把支承压力传递给顶煤的结论。
7.By means of similar simulation , lateral abutment pressure distribution and concentration degree which at the face of the upper coal , the distance between peak stress and coal surface , the influence circle of abutment pressure , and the transfer and weakening of concentrated pressure at the bottom side are analyzed on actual geology data in pingdingshan 8th mine f15 and f ( subscript 16 - 17 )
摘要采用相似模拟的方法,以平顶山八矿己二采区己15和己(下标16 - 17 )煤层实际地质资料为基础,分析了近距离煤层上煤层开采时,在上煤层采场两侧向的支承压力分布及集中程度、峰值距煤壁的距离、支承压力的影响范围;一定范围内底板中集中应力的传递及渐衰减特征。
Similar Words:
"支承系统" English translation, "支承线" English translation, "支承销" English translation, "支承小梁" English translation, "支承心轴" English translation, "支承压力 支力 轴承压力 承载压强" English translation, "支承压力,轴承压力" English translation, "支承压力不可调的辊式矫直机" English translation, "支承压力带" English translation, "支承压力可调整的辊式矫直机" English translation