| 1. | Analysis on flow and sediment movement in approach channels of tidal river branches 感潮河段船闸下引航道水沙运动及泥沙淤积 |
| 2. | Numerical model for effects of outlet shapes of approach channels on sediment deposition 引航道出口形态对泥沙淤积影响的数学模型研究 |
| 3. | Studies on the characteristic of unsteady flow at lower lock approach deserve regards from the aspect of theoretical research and actual practice consideration 船闸下游引航道非恒定流特性的研究是一个在理论和生产实践中均值得重视的问题。 |
| 4. | Based on the discussion of the characteristics of mountainous rivers and the problems concerning ship lock arrangement , this paper proposes of ship lock approach channel arrangement type adapting to the characteristics of mountainous rivers 摘要介绍山区河流的特点及船闸布置存在的问题,提出适应山区河流特点的船闸引航道布置型式。 |
| 5. | Each member should take measures , whenever necessary , to ensure the safety of seafarers from aggression and other unlawful acts while ships are in their territorial waters and especially in approaches to ports 当船舶位于一成员的领海,特别是港口的引航道时,该成员国应在必要时采取措施保证海员安全,使他们不受侵袭和其他非法行为的侵害。 |
| 6. | In the whole course of flood regulation of tgp during flood season as well as filling and discharging of its shiplock , unsteady flow at different levels will occur in the upper and the lower access channels , which will exert an adverse impact on the navigation 摘要三峡水利枢纽在汛期调洪和船闸充、泄水运行全过程,在上、下游引航道内将产生不同程度的非恒定流,对航运构成相应的不利影响。 |
| 7. | The excavation on the left side of xiangjiaba hydropower plant would form the large - scale artificial slope , which refers to the main project near the source of the river and the project of intake sea - route near the mouth of the river , and its height would reach 150 meters 向家坝水电站左岸开挖将形成规模较大的人工高边坡,涉及上游段的主体工程和下游段的引航道工程,工程边坡的高度达150m 。 |
| 8. | Based on discussing methods to study the characteristic of unsteady flow at lower lock approach , several improved project proposals are provided , and then the alternate proposals are tested using both physical model and numerical model 在讨论船闸下游引航道非恒定流特性研究方法的基础上,对江苏泗阳船闸下游引航道非恒定流进行了分析研究,提出了几种工程改进方案,并相应地进行了数值计算和物理模型试验。 |
| 9. | Qinjiatuo bridge for three gorges project is a super bridge over the approach of the sea - route on lower reaches of the temporary lock . the bridge is 303 . 10m in length . the bridge is the heaviest - loaded bridge in asia at present , whose design loads are automobile - 135 and trailer - 660 三峡工程覃家沱桥为横跨临时船闸下游引航道的一座特大桥,大桥全长303 . 10m ,设计荷载为汽? 135级,挂? 660级,为目前亚洲第一重载桥。 |
| 10. | The pattern of flow of lower lock approach is usually complicated due to the influences of the interaction of flow underpoured from different locks . generally , physical model is applied to study the current field for the case of irregular boundaries and complex flow pattern 由于受多线船闸下泄水流相互作用的影响,船闸下游引航道非恒定流流态十分复杂,对于此类有复杂流态的非恒定水流运动问题一般采用物理模型进行研究。 |