The finishing of the high - and - medium pressure outer casing for the 300mw steam turbine unit 汽轮机组高中压外缸的精整
2.
The method of surfacing welding sealing strip was adopted to repair the deformation of the flange joint surface of the high and intermediate pressure outer casing 摘要湛江发电厂在1999年1 (上标# )机组大修中采用堆焊密封带方法修理了汽轮机高中压外缸中分面的变形缺陷。