English translation for "坝高"
|
- dam height
height of dam heightofdam
Related Translations:
- Example Sentences:
| 1. | The dam is 50 metres in height . 坝高五十米。 | | 2. | The design for the optimum height of warping dam 淤地坝最优坝高设计 | | 3. | The dam was built with granite and concrete , 90 ft . high and 400 ft . long and was 60 ft . wide at its base 水坝用花岗石和混凝土建造,坝高90尺、宽400尺、坝基厚60尺。 | | 4. | Xiaowan hydropower station , with its 292m high arc dam , is the largest one under construction in the lancang river 澜沧江小湾水电站坝高292m ,是目前在建的最高的拱坝。 | | 5. | The dam of mania hydroelectric project is a soil - rock dam with spreading gradation soil of core wall . the height of the dam apices is 4261 . 3m and the maximal height is 76 满拉水利枢纽工程拦河坝为宽级配砾质土心墙土石坝,坝顶高程4261 . 3m ,最大坝高76 . 3m 。 | | 6. | Baihetan hydroelectric power station of jinsha river is another planned giant project after three gorges and xiluodu water c onservancy p roject i n c hina 金沙江白鹤滩水电站是我国继三峡、溪洛渡之后开展前期工作的又一座巨型电站。最大坝高275m ,装机容量12000mw 。 | | 7. | During last century there were more than 200failures of dams greater than 15m high . they have caused huge economic property and life loss . many people suffered from the catastrophes of dam break 据不完全统计,在二十世纪,坝高在15m以上的溃坝事件就有200多起,造成了巨大的经济和生命损失。 | | 8. | Nuozadu hydraulic - power station will be built in lantsang river in yunnan province , has a oversize hydraulic power project , its highest height of the design dam achieve 260 meter , and its installed capacity arrive 5 , 600 , 000 kilowatt 云南省澜沧江糯扎渡水电站,最大拟建坝高260m ,装机容量560万千瓦,属特大型水电工程。 | | 9. | Abstract : for high arch dams in valleys with the characteristics of high water head , large discharge and large power , the problems of energy dissipation and scour prevention are serious . based on scientific studies , new comprehensive measures are proposed , including dispersion of discharge to waken wallop of the current , and reinforcement of riverbed to enhance the erosion - resistance . the measures can be used to solve the problem of energy dissipation properly . a typical layout scheme has been proposed in which slotted bucket with diversion teeth , double deck with pores , and cushion pool are considered practice has proved that the scheme is reliable and the effect of energy dissipation is obvious 文摘:高拱坝泄洪消能的特点是坝高落差大,流量大,功率大,位于河谷狭窄地区,泄洪消能与防冲问题突出.经科学研究,采用“分散泄洪,削弱水流冲击力,加固河床,增强河道抗冲能力”的综合治理措施,较好地解决泄洪消能布置问题.提出了表孔大差动坎加分流齿、双层多孔、水流撞击、下设水垫塘联合消能的典型布置方案,经实践证明,方案可靠,消能效果好 | | 10. | Abstract : xiao wan hydroelectric installation locate in the boundary between nanjian county and fengqing county of the western of yunnan province . the height of dam is 292 m , and its installed capacity is 4 , 200 , 000 kilowatt , so it ' s a large - scale water - power engineering . the height of excavation reach to 80 m . so it is sure , that the excavation will influence on the stability of the slop . the stability of the slop is the necessary condition to assure the trouble - free operation of the station 云南省澜沧江小湾水电站位于云南省南涧县和风庆县的交界处,最大拟建坝高292m ,装机容量420万千瓦,属特大型水电工程。左岸砂石系统边坡位于澜沧江左岸8 ~ #山梁,主体开挖高度达80m ,开挖对边坡的稳定性产生很大的影响。该边坡的稳定性对水电工程建设的顺利进行。 |
- Similar Words:
- "坝顶溢洪道" English translation, "坝顶闸门" English translation, "坝段" English translation, "坝段接缝" English translation, "坝垛中心距" English translation, "坝高五十米" English translation, "坝跟" English translation, "坝跟截水墙" English translation, "坝工分区填筑" English translation, "坝河" English translation
|
|
|