Mobile
Log In Sign Up
Home > chinese-english > "发电机出力" in English

English translation for "发电机出力"

generator output

Related Translations:
磨煤机干燥出力:  dry coal capacity of mill
煤气发电机:  gas engine driven generatorgas-driven generatorgasenginedrivengenerator
发电机熄火:  flame-out of engine
自控发电机:  automatic generator
平衡发电机:  balancing dynamobalancing generatorequalizing dynamo
发电机有效功率:  generator active power
立式发电机:  vertical type generator
机动发电机:  engine driven generatorengine-drive generatorengine-driven generator
发电机失速:  engine stall
大功率发电机:  high-power generatorhigh-rating generator
Example Sentences:
1.Finally , a method that can accomplish the generation rescheduling preventive control is presented
( 4 )提出了一种利用临界切除时间来实施发电机出力预防控制的方法。
2.Om , the electricity generated by turbine generator increased to 5 . 0 million kw , which was relatively reasonable
如将设计水头提高到37 0米,水轮机发电机出力增容到5
3.Finally , fuzzy chance - constrained programming provides a powerful means to deal with the intractable constraints functions such as those of generation companies " output
最后,提出将发电机出力等难以处理的不等约束转换为模糊机会约束的思路。
4.When there is active power deficiency or line overloaded , linear programming method with multi dispatching strategies is applied to adjust generator output or shed load
当潮流计算结果出现线路过载或有功缺额时,采用线性规划方法,建立电力系统有功发电再调度算法,加入了各种优化目标策略,寻找调整发电机出力或者切负荷措施。
5.So , it ' s necessary to develop more effective cct - calculating method , which will play an important role in improving power system stability , and provide possibility in realization of online control
因此,寻找更为有效的临界切除时间计算方法和发电机出力预防控制方法是必须的,对提高电力系统稳定性有极大的作用,也为日后在线控制的实现提供了可能性。
6.Thorough study has been done to solve the problems . a fast cct calculative method was suggested which could satisfy the precision need , the method was applied in the preventive control of the generator outputs
本文正是着眼于上述问题,进行了大量的研究工作,提出了一种快速的能满足精度要求的临界切除时间的计算方法,并将该方法应用于发电机出力的预防控制之中。
7.The results showed that considering the general performance of turbine and the discharge capacity of runner hl240 - lj - 420 , when the design head was 36 . 2m , the electricity generated by turbine generator increases to 4 . 8 million kw , which was relatively reasonable
结果表明:考虑到水轮机的综合性能和hl240thj一10流道的过流能力,在设计水头为36 2米时,水轮机发电机出力增容到4
8.( 2 ) retrofitted the small turbine of tai pin shao hydropower station in this paper . the results indicated that given the unchanged channels of the original runner hl240 - lj - 120 and satisfied cavitation condition and stability requirement , the electricity generated by the turbine generator increased from 3000kw to 3600kw when the design head was 36 . 2m , which arrived at the expectant objective
( 2 )对太平哨电厂的小机进行了改造,在不改变原hl240 - lj - 120流道并满足气蚀和稳定性要求,在设计水头为36 . 2米时,水轮机发电机出力由原来的3000千瓦增容到3600万千瓦,达到了预期目标。
Similar Words:
"发电机层" English translation, "发电机场调整" English translation, "发电机车" English translation, "发电机充电指示器" English translation, "发电机出口总开关" English translation, "发电机出线端净出力" English translation, "发电机传动" English translation, "发电机传动带" English translation, "发电机传动端盖" English translation, "发电机传动联轴节" English translation