预算单价 meaning in English
unit price used in budget
Examples
- The engineering work load detailed list reckoning method has the advantages of simple , clear , operation easily , remaining the account settlement rarely , etc compared with the present day running unit price budgeting method , which will be the direction of national engineering cost system reform , cost management first , this text states thoroughly the existing problem of the present day national engineering mode and price reckoning method , and the necessity of application right away and the existing problem , and then make a detailed discussion of the principle of quota reckoning and the engineering work load detailed list reckoning , so that we may be safe to draw such a conclusion that the new cost management system of the new price reckoning method is a necessary way to adapt to the international competition
工程量清单计价法与目前我国实行的预算单价法相比,有简单、清晰、可操作性强、不易留结算尾巴等优点;是我国工程造价体制改革的方向。本文首先全面阐述了目前我国工程造价管理模式和计价方式存在的问题以及现在推行的必要性及存在的问题,进而对定额计价和工程量清单计价的原理进行了详细的论述,从而得出实行新的计价方式的造价管理体制是适应国际化竞争的必走之路。然后,对即将实行的工程量清单计价模式各单位需要面对的风险,提出几点抵御风险措施。